3D design and 2D drafting for pedestal EV charging station.
Customer Need:Â
The charger unit should be protected from rain and heat, easy installation process on site.
Result:
Pole and canopy connection using bolts.
Lead time:
4 weeks (3D model, 2D drafting, and revision)